| Arrow Ridge Business Park at a glance: |
| •A 160-acre business and industry park with easy connections to water, sewer, natural gas, and electricity |
| •A pre-designed, 21,000 SF virtual spec building that could be ready for occupancy in as little as 120 days |
| •Approximately 300,000-gallons/per day sewer treatment capacity that can accommodate higher strength waste that may reduce pre-treatment costs for large plants |
| •Alliant Energy has over 35 MW of electricity served redundantly from two 25 MW substations with 3-phase looped power to each industrial site |
| •WE Energies has a main natural gas station on site |